Service Flow
01 On-site survey and survey of building conditions to understand the basic situation
02 Demand analysis and communication of customer decoration needs, and preliminary confirmation of the design direction.
03 Preliminarily determine the plane size drawing, ground paving drawing, pipeline layout drawing, etc...
04 It is the first time to determine the detailed communication of the design plan with the customer.
05 Determine the blueprints Building construction drawings, structural construction drawings, equipment construction drawings, etc...
06 Plan confirmation Check customer needs and site conditions, and confirm the overall cost.
07 Signing a contract A unified contract model for the Shanghai tooling industry.
08 Sign the contract and communicate and coordinate with the on-site construction personnel to ensure the implementation of the plan.
09 Completion acceptance Survey the building condition and understand the basic situation
10 After-sales maintenance 24-hour online customer service, full tracking, door-to-door maintenance.